Building a new care home usually takes 12 to 24 months on site, depending on its size and how complex it is. That's on top of design and planning. The frame you choose affects the cost, the programme and the fire design, so we decide it at concept design stage, before the cost plan firms up.
Traditional build (brick and block). Familiar to planners, insurers and most contractors. Masonry doesn't burn, and it's good for sound between rooms. But it's slower on site, it depends more on the weather and on bricklayers, and it can cost more where labour is tight.
Timber frame. Panels are made in a factory, so the building is usually weathertight sooner and the programme is easier to predict. It's also lower in carbon. The trade-off is fire. Cavity barriers and fire-stopping have to be designed and checked carefully, and a timber frame is most at risk during construction, before it's protected. Insurers will expect a fire safety plan for the site.
Steel frame. Suits larger or taller homes and layouts that need longer spans, such as big lounges and dining rooms. Steel doesn't burn, but it needs fire protection, such as boards or intumescent paint. On smaller homes it often costs more than the other options.
There's no single best answer. LAP, the structural engineer and our QSs compare the options for your site, size and budget, and we'll show you the cost and programme for each before you choose.