Design: LAP ArchitectsSilverwoods
Thorrington, Tendring
A 72-bedroom residential care home for a private client. LAP took the scheme through planning permission and completed the working drawings.
Care home design by LAP Architects + Interior Designers Ltd, a RIBA Chartered Practice based in Chelmsford. Costed and built by Care Home Builders.
Essex is home ground for our design partner. LAP has designed care and later living schemes across the county, in Thorrington, Braintree and Billericay.
But Essex is changing what it needs. The county council says there are already more residential care beds than it needs. The real shortfall is nursing care for people with more complex needs. So the first question isn't just how many beds fit on a site. It's what kind of beds.
Silverwoods, Thorrington · Design: LAP Architects
Care Home Builders is a care home construction company, not an architecture practice. Design on our projects is led by our lead design partner, LAP Architects. Where a project needs it, we may bring in another ARB-registered practice with care home experience. You can check any architect on the Architects Register.
LAP Architects + Interior Designers Ltd works from 123 New London Road, Chelmsford. It's led by directors A Hill and S Genco, both RIBA Chartered Architects. These are LAP's care and later living schemes in and near Essex.
Design: LAP ArchitectsThorrington, Tendring
A 72-bedroom residential care home for a private client. LAP took the scheme through planning permission and completed the working drawings.
Design: LAP ArchitectsBraintree
A retirement village on a 4.8 hectare site for Hallmark Developments, with 101 assisted living flats, cottages, bungalows and a clubhouse.
Design: LAP ArchitectsBillericay
A new build over-55s retirement development for Hallmark Developments, designed to fit the local style, with communal facilities for residents.
Design: LAP ArchitectsCollier Row, Romford
A 92-bedroom residential care home. A second phase added a high-dependency wing for people living with dementia, mental health conditions and learning disabilities.
Projects designed by LAP Architects + Interior Designers Ltd. Images courtesy of LAP Architects.
LAP is responsible for the architectural design, within its agreed appointment.
We cost the design at concept, planning and technical design, so you know the price before each next step.
Care Home Builders prices and builds the agreed scheme, under one contract if you want it.
Each starting point needs different checks. Pick the one that sounds like you, and you'll know what to send us and what you'll get back.
In Essex: Check Green Belt (92% of Epping Forest district) and the coastal bird zone first.
Start with your site →In Essex: The county council's main gap is nursing, so adding nursing beds fits best.
Start with your home →In Essex: Coastal hotels and guesthouses often need a new lift and much bigger bathrooms.
Start with the building →In Essex: Tendring needs the most nursing beds. Residential is oversupplied in much of the county.
Start with your brief →In 2025, Essex County Council assessed how many care home beds each district will need. Its message is clear: "There is currently an oversupply of registered residential care homes in the market." What it wants is more nursing care, and homes for people with more complex needs later in life.
Extra beds needed by 2029Extra beds needed by 2044
| District | Extra nursing beds needed | Extra residential beds needed |
|---|---|---|
| Tendring | ||
| Braintree | ||
| Epping Forest | ||
| Colchester | ||
| Chelmsford | ||
| Basildon | ||
| Uttlesford | ||
| Brentwood | ||
| Harlow | ||
| Rochford | ||
| Maldon | ||
| Castle Point | ||
| All Essex | 814 by 2029 · 3,329 by 2044 | 23 by 2029 · 1,625 by 2044 |
Source: Essex County Council, Supported and Specialist Housing and Accommodation Need Assessment, 2025. "Surplus" means the council's 2029 figure is below zero. Covers the 12 Essex districts. Southend and Thurrock are separate councils.
Every district needs more nursing beds by 2029. Most need few or no extra residential beds until the 2030s.
206 more nursing beds by 2029, and 496 by 2044. LAP's Silverwoods scheme is in Tendring.
It needs 120 more residential beds by 2029, and its homes were 92% full in March 2025, the highest in the county.
Older homes are closing, and the council notes that beds without en-suites are still in use. That's a market for well-designed extensions and upgrades as well as new homes. We check the figures for your district at feasibility.
A nursing home isn't a residential home with nurses added. Residents need more help to move, so the building has to allow for it.
All of that costs more per bed. Our QSs price it from the first layout, so the nursing case and the build cost are tested together. Room sizes and space standards
Not every rule applies to every site. The district, the site's history and its designations decide which ones matter. These come up most often.
The Metropolitan Green Belt covers much of south and west Essex. A new care home on open Green Belt land is hard to get approved. Extensions, replacement buildings and sites that may count as grey belt have a better chance. Grey belt guide
The coast is protected for its birds, and the Essex Coast RAMS covers new homes in a zone that reaches well inland. Care homes are judged on how mobile and independent residents will be. High-dependency and end-of-life care are generally excluded.
A Special Area of Conservation. Residential schemes within 6.2 km need an extra assessment of their impact on the forest, and may need to fund green space or management. Traffic and air quality are part of the test too.
Low-lying places such as Canvey Island and parts of the Tendring and Maldon coast are at risk of flooding. Care homes count as a "more vulnerable" use. You'll need a flood risk assessment, and the design usually has to keep bedrooms above flood level and give residents a safe way out.
The Dedham Vale National Landscape runs along the Suffolk border, and Essex has many conservation areas and listed buildings. Sites in or near them get closer scrutiny on scale, materials and landscaping.
Planning an extra care scheme? Essex County Council has its own extra care housing design guide, and self-contained flats may be treated as housing (C3) rather than care (C2). See our care home planning permission guide.
Planning and care are often run by different councils. Here's who does what in Essex, and what's changing.
Essex County Council arranges care across its 12 districts. Southend-on-Sea and Thurrock run their own.
Their commissioners know where beds are short. A scheme that meets a need they've named has a stronger planning case.
Not every rule applies to every site. The postcode and the site's history decide which ones matter.
From April 2028, Essex, Southend-on-Sea and Thurrock councils are due to be replaced by five new unitary councils.
Local plans and care priorities can change with new councils, so we check the latest position at feasibility.
Ask for pre-application advice before you apply. Most councils offer it for a fee. It's the cheapest way to test a scheme before paying for a full application, and LAP can prepare the drawings for it.
Essex has more space than London or Surrey, so new builds are more realistic here. On a larger site, the home, service yard, parking, drainage and gardens all have to be tested together.
The design challenge: the best layout isn't always the one with the most beds. It's the one that meets the care brief at a cost that works.
Care home build costs →Adding a wing to an open home can be cheaper and quicker than buying a new site, and with older homes closing, there's demand for it.
The design challenge: working with the existing floor levels, structure and services. An extension can trigger upgrades elsewhere, so they need to be in the budget from the start.
Refurbishment or new build? →A former hotel on the Essex coast may have plenty of en-suite rooms, but the room count isn't the bed count. Hotel bathrooms are rarely big enough for hoists, and the fire strategy has to change. A large house may have steep stairs and level changes. An office may be too deep for every bedroom to get daylight.
The design challenge: LAP can compare converting the building with keeping part of it and adding a new bedroom wing. If conversion doesn't pay, it's better to know before you buy.
Converting a property into a care home →A planning drawing isn't a price. A scheme can look simple on paper and still need expensive groundworks, structural changes or new power and drainage connections. Our QSs review the floor area, specification, structure and services as LAP develops the design.
Allow separately for land, fees, surveys, planning costs, furniture and equipment, and contingency.
A new care home takes years, not months. Here's a realistic picture, so you can plan funding and staffing around it.
Layouts, a realistic bed count, the site constraints and a first cost range.
The council's early view, before you pay for a full application.
Most new care homes are major applications. In practice, decisions often take longer.
Structure, fire strategy and services designed, and the build price agreed.
For a new home. Extensions are usually quicker, but working around residents adds time.
The operator registers the home with the CQC. Apply early, as it can take months.
These are typical ranges, not promises. We give you a timeline for your own site at the first meeting.
The first conversation is free. We agree the scope and fee for any feasibility work before it starts. A feasibility study isn't a guarantee of planning permission, and it doesn't replace legal or technical due diligence.
Discuss an Essex site before you buyCan't see your question? Ask us. The first conversation is free.
No. We're a construction company. Design is carried out by independent ARB-registered practices, mainly our lead design partner, LAP Architects, which is based in Chelmsford. We tell you which practice will design your scheme before anyone is appointed.
Mostly nursing care. Essex County Council says there are already more residential care beds than it needs. Its 2025 assessment estimates around 814 more nursing beds will be needed by 2029, against only 23 more residential beds. Harlow is the main exception, where residential beds are close to full. We check the figures for your district at feasibility.
It can. Much of Essex falls inside its zone of influence. Care homes are judged case by case, based mainly on how mobile and independent residents will be. High-dependency and end-of-life care are generally excluded. Where it applies, you pay a tariff per dwelling, or a reduced rate based on bedspaces.
Sometimes, but it's hard. Much of south and west Essex is Metropolitan Green Belt, including 92% of Epping Forest district. Extensions, replacement buildings and sites that may count as grey belt have a better chance than open land. We bring in a planning consultant where it's needed.
No. The number of beds depends on the site, planning, access, the care brief and the technical design. A feasibility study gives you a realistic figure and shows which assumptions still need testing.
Yes. Feasibility is a separate stage. You decide whether to go further once you've seen the layouts and the costs.
No. We can review your drawings for buildability and cost, and work with your existing design team.
It depends on the building, the design stage and which consultants are needed. The first conversation is free. We agree the scope and fee for any design or cost work before it starts.
Send us the site postcode, the property details or any drawings you have. Tell us how many beds and what type of care you have in mind. The first conversation is free, and any design or cost work is scoped and quoted before it starts.
